WebAug 25, 2024 · Soling work – m 2 (Square meter). 21. Manholes – No. (Number). 22. Chambers – No. (Number). ... 10 Types of Roads Classification in India(Urban & Non-Urban Road) 3 Characteristics of Sewage ... Building Materials & Construction; History of Road Development in India; 100+ All Traffic Signs or Road Safety Signs in India as per IRC; WebJul 15, 2024 · There are the following advantages of water-bound macadam road such as; The construction cost is comparatively low on WBM road. No skilled labourers are required in the construction of the WBM road. From locally available materials they are constructed. It can resist a load of the traffic of about 900 tonnes per lane per day if these roads are ...
Unit of Measurement of Common Items of Civil Engineering Work
WebSurplus excavated material shall be used in the construction of embankments, or spoiled as directed by the Superintendent. The Contractor shall supply and erect any necessary sheeting and bracing to support the excavation in a safe manner and in accordance with statutory requirements. The excavation shall be kept free of water. WebApr 1, 2024 · This paper presents the use of construction and demolition (C&D) materials with clay, and a comparative study on the C&D and natural aggregate (NA) utilisation for … how many seconds are there in 2 hours 10 mins
What is the difference between Granular Sub Base (GSB) …
WebJan 14, 2024 · Construction of road from Ghoshpara to Barmura Panchayet Office via Ghoshpara School under Paharmura Panchayet L= 0.50km: RIDF-XXIV: 08.0.3.19: ... 1.20Km soling road has depressed in different stratches in Gr-II & III,re- sectioning by sand filling selected soil will be started by may,2024 & then WBM work will be started. SPA: 1: Webroad with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete. WebSep 28, 2024 · The labor rate per cu ft. of the rubble soling work ranges from INR 9/- to 15/- depending upon the region. Let us consider an average rate of INR 12/ – per cu ft. The total cost of labor for rubble soling. = total vol. of rubble soling in cu ft. × labor rate/ cu ft. = 90 cu ft. × 12/-. = INR 1,080/-. how many seconds are there in 3 days